Do I need a structural engineer to remove a wall?

If the wall is load-bearing, yes. An engineer calculates the beam, padstones and any column needed, and Building Control will expect to see those calculations. We can recommend engineers if you don't have one.

Is Building Regulations approval needed for structural work?

Yes. Removing load-bearing walls, new foundations and extensions all need Building Regulations approval, either through the council's Building Control or a registered building control approver. Inspections happen at key stages and a completion certificate is issued at the end.

How long does a steel beam installation take?

Installing a typical RSJ to open up a ground floor can take a few days, including propping, removal, fitting the steel and making good. Plastering and decoration add time. We give a programme with your quote.

Will I need to move out?

For most structural alterations, no, though some rooms will be out of use. For larger refurbishments or work affecting kitchens and bathrooms, some clients choose to stay elsewhere for part of the job.

Do you handle Party Wall matters?

The Party Wall etc. Act 1996 applies to much structural work near a shared wall or boundary. Notices are the building owner's responsibility, but we'll advise on timing and work with appointed surveyors so the programme isn't held up.

Can you build from my architect's drawings?

Yes. Most of our projects come with plans and engineers' details already prepared. If anything is missing for construction, we'll flag it at the quoting stage.

What does a new build involve?

After planning approval, a new build typically moves through site set-up, groundworks and foundations, superstructure, roof, first fix services, plastering, second fix and finishes, with Building Control inspections along the way.

How do you price construction work?

We price from the drawings and specification, broken into a schedule of works. Where something can't be known until opened up, such as ground conditions, we say so and explain how it would be costed.

Are you insured?

Insurance certificates are available on request and are sent before structural work is booked. We’d encourage you to check them, along with your engineer’s and Building Control paperwork.

On site

From drawings to sign-off

A methodical programme that keeps the structure, inspections and trades in step.

  1. Review the design

    We go through drawings and calculations with you and flag anything that affects cost or programme.

  2. Price & programme

    You get a priced schedule of works and a realistic timeline before you commit.

  3. Groundwork & structure

    Foundations, walls, steels and roof go in, with each stage inspected as required.

  4. Finish & certify

    Services and finishes are completed and we make sure the Building Control completion certificate is issued.